Below is after the second (grey) coat has been applied and the RV Roof Armor thick caulking is on all the roof penetrations.
Below is the final white coat, the previous grey coat allows Dave to be sure he's covered everything in the finishing white coat. All the covers and dish have been installed.
The first brown coat took a day longer to dry that expected so the total installation took four days. The second and third days were
cut short due the the rain and long dry times. The first and last days were 9 hours each. I'm sure this will fix the rear leak but not as sure about the front leak, that could be coming from somewhere other than the roof. Time and weather will tell!
